Descrição
In 1954 and 1955, Reich published two volumes of his follow-up to the Orgone Energy Bulletin entitled CORE (Cosmic Orgone Engineering), comprising a total of 344 pages. On the inside cover of each volume, Reich included the following note:
“CORE (Cosmic Orgone Engineering) continues the function of its predecessor, the Orgone Energy Bulletin (vols. I-V, 1949-1953). CORE is the official organ of the ORGONE INSTITUTE which is devoted to Basic Research in the Realm of the Primordial Cosmic (Pre-atomic) Energy. CORE deals, among other things, with: Pre-atomic Chemistry (Oranur Chemistry); Drought and Desert Research; Removal of DOR clouds, Rain-making and Fog-lifting with the Cloudbuster; Functional Orgonometry; and the Bioenergetics of Human Emotion as far as human character reactions are involved with the above mentioned cosmic functions.”
Volume 6 – Numbers 1-4, July 1954 (140 pages)
Introduction to OROP Desert
Expansion and Contraction in the Atmospheric OR Energy
Behavior of smoke; Nature of fog; Dispersive qualities of OR energy; Distribution of rainfall; Where does the moisture come from? Clues to answer; The ring around the sun; Seasonal expansion and contraction of OR envelope.
Spaceships and Desert Development
DOR and Melanor; Smog; Symptoms of DOR sickness; Quest for source of DOR and Melanor; Functional meaning of Melanor; Deterioration of forests; Scope of Cosmic Engineering; Clarification of the source of Melanor; Visitors from outer space; Space ships and DOR; Principle of Life on Earth challenged.
DOR Removal, Cloud-busting, Fog-Lifting
DOR clouds; Stillness and Bleakness; Disappearance of sparkle from the landscape; Human awareness of DOR; Geiger counter reactions to DOR; First DOR removal; “Cloud-busting”; Use of OR potential; The lightning rod; Destroying and creating clouds; Lifting fog; The “spiral draw”.
OROP Desert Project
Change from earthly to cosmic perspective; Danger of desert to life; Mass functions have developed from primordial energy functions; Mountains impede OR streams; Deserts can be made green; Blueprints for the fructification of deserts.
OROP Rangeley – August 1-2, 1952
DOR-affected clouds; Dissipation of clouds and absence of thunder-storms over Orgonon; Dynamics of drought clouds; Breaking drought; Functions opposing drought.
OROP Ellsworth – July 5-6, 1953
Drought broken; Failure to draw from zenith; Protocol of drawing operation; Fog front rolls in from ocean; Gentle rain falls; Reports on OROP Ellsworth; Monitoring Oranur atmosphere; Plague activities.
OROP Orgonon – July 23, 1953
Drought broken; Failure to draw from zenith; Protocol of drawing operation; Fog front rolls in from ocean; Gentle rain falls; Reports on OROP Ellsworth; Monitoring Oranur atmosphere; Plague activities.
OROP Children’s Parade – August 8-9, 1953
Request for rain-free day; Not promised—experimentation only. Problem of how to keep sky clear: Drawing from west with one tube; Rain prevented from falling over Rangeley.
OROP Boston – September 2, 1953
CORE operator a trustee only of natural functions; Severe heat in New York; Attempt to relieve cities; Weather Bureau informed; Simultaneous three-Cloudbuster draw; Protocol of OROP Boston; Storm unpredicted hits Boston; Relief from heat; Desert is inevitable result of the immobilization of OR energy; Contradictions in Weather Bureau forecasts; Foundations of Oranur Weather Control.
OROP Galactic Stream, Hancock – October 22, 1953
The Galactic OR Stream is real; DOR removal near ocean; First report of a student operator; Nothing is unimportant in Cosmic Engineering; Drawing against Galactic Stream; Rain goes toward northeast while winds come from northeast; Chain reaction storms; Drought again broken; Caution and daring needed; Gradient of dryness toward Southwest; Need to regulate Cloudbuster operations; Space ships and space problems; Outlook.
Appendix
Rules to follow in Cloud Engineering
Protocols of the first 97 DOR removal operations
Documentary record on information given regarding Oranur, DOR and Weather Control